Saturday, August 25, 2018

High Point Greenway



 New signs that were added to the High Point Greenway in 2020, along with a new section connecting the High Point Greenway starting at Armstrong Park to the Bicentennial Greenway ending at the Piedmont Environmental Center, totaling4.5 miles.


A long gradual downward slope that would be awesome to ride a skateboard on.


The new sections which were opened in 2019, started at Penny Road and go between two residential areas then you come to a 1/2 mile of nothing but boardwalk the weaves through a swamp.




 The bridge over the Deep River.



View of the Deep River and boardwalk crossing the Boulding Branch




I got to see a game being played that I had heard about, and that is sweeping the nation.  Many former tennis players are now playing pickleball and old deteriorating, hardly ever used tennis courts are being refurbished into Pickleball courts. 



 The campus of High Point Univerity.


HPU baseball diamond.



 There are two tunnels one goes under  N.Cennenial St. and the second tunnel goes under U.S. 311/I-74.




One of the fancy crosswalks.



One of many bridges over the Boulding Branch.


A bridge view of the Boulding Branch.



Here is where  High Point Greenway begins at Armstrong Park. There is a spacious parking area, dog station, and map.


No comments:

Post a Comment